Lumen Vietnam Fund

Blog

Vietnam, UNIDO sign deal for sustainable industrial development

Vietnam, UNIDO sign deal for sustainable industrial development

The Country Program for Inclusive and Sustainable Industrial Development for 2025–2028 has an estimated budget of $72 million.

Vietnam and the United Nations Industrial Development Organization (UNIDO) have signed a new Country Program for Inclusive and Sustainable Industrial Development for 2025–2028, marking a further step in their long-standing partnership.

The agreement was signed on April 20 in Hanoi by the Ministry of Finance and UNIDO.

With an estimated budget of $72 million, the program focuses on green industrial transformation, strengthening competitiveness and sustainable value chains, and improving industrial policies and institutions.

Since the official establishment of the partnership, UNIDO has collaborated with Vietnam to implement over 170 projects since 1978 in areas such as small and medium-sized enterprise development, quality infrastructure, energy efficiency, clean production, and sustainable supply chains. Based on this, within the framework of the new program, cooperation between the two parties will continue to be expanded through comprehensive intervention programs and activities, combining policy advice, technical support, and investment mobilization. The program is expected to open up new cooperation opportunities in the field of agricultural processing, particularly for value chains with potential such as rice and tea, focusing on value addition, meeting sustainable standards, enhancing resilience to climate change, and improving livelihoods in rural areas.


Source: Nguyệt Hà

Latest Posts

Nearly 200km of expressway from Quang Ngai to Cu Mong Tunnel to open on April 29

Nearly 200km of expressway from Quang Ngai to Cu Mong Tunnel to open on April 29

Just in time for the April 30 holiday, a stretch of the North - South expressway from Quang Ngai to the Cu Mong Tunnel will officially open to traffic…

Just in time for the April 30 holiday, a stretch of the North - South expressway from Quang Ngai to the Cu Mong Tunnel will officially open to traffic, significantly accelerating travel along the North-South corridor.

Project Management Unit 2 (under the Ministry of Transport) was quoted by the Government News as announcing that the main route of the Quang Ngai – Hoai Nhon component project will be officially operational starting at 11:30 am on April 29.

The main section being opened in this phase spans approximately 88km. The expressway section begins at Km1050+00 (Nghia Giang commune, Quang Ngai province), where it connects with the Da Nang – Quang Ngai section of the North-South Expressway, and ends at Km1138+00, connecting to the Hoai Nhon – Quy Nhon section of the expressway.

The project began in January 2023 with a total investment of over VND21.110 trillion (nearly $802 million) from the State budget. To date, key items on the main route have been completed, most notably three major mountain tunnels: Tunnel No. 1 (Duc Pho), Tunnel No. 2 (Huan Phong), and Tunnel No. 3 (Binh De).

Under the current traffic organization plan for this initial phase, the expressway section will operate with four lanes and a roadbed width of 17 meters. The maximum speed is set at 90 km/h, with a minimum speed of 60 km/h.

In addition to the Quang Ngai – Hoai Nhon section, April 29 will also see the opening of the Hoai Nhon – Quy Nhon component project and Package 11-XL (Km0+200 - Km19+800) of the Quy Nhon – Chi Thanh component project.

The Hoai Nhon – Quy Nhon section of the expressway has a total length of 70.1km whilst the Quy Nhon – Chi Thanh section of the expressway has a total length of 61.7km (excluding the 5.1km section through the Cu Mong Tunnel). Both projects commenced construction on January 1, 2023.


Central Vietnam province Gia Lai to have 600MW pumped storage hydropower plant

Central Vietnam province Gia Lai to have 600MW pumped storage hydropower plant

Gia Lai province is accelerating procedures to begin construction of the 600-megawatt Vinh Thanh pumped storage hydropower project, with a total investment of nearly VND11 trillion ($417.49 million).

According to a leader of the provincial Department of Industry and Trade, the Gia Lai People’s Committee has instructed relevant agencies to support and create conditions for Vinh Thanh Pumped Storage JSC to start construction in early 2027, aiming for operation by 2030.

The project’s main components include a newly built upper reservoir with a capacity of 4.3 million cubic meters, a lower reservoir utilizing the existing Dinh Binh irrigation lake, a bidirectional water tunnel system, and reversible turbines. For grid connection, the project will construct a double-circuit 500 kV transmission line linking the plant to the Binh Dinh 500 kV substation.

The project was approved in principle by the Gia Lai People’s Committee for research and survey in late February 2025. After more than a year of study, on April 23, the investor - Vinh Thanh Pumped Storage JSC, together with its French partners, reported survey and research results, concluding that the project is highly feasible.

Once operational, the plant is expected to generate an average of 783 million kWh per year, contributing to energy security and helping stabilize the national power system.

In addition, the project is projected to contribute VND320-350 billion ($13.28 million) annually to the local budget, create 300-500 jobs during construction and 40-50 jobs during operation, and promote socio-economic development, supporting the province’s goal of sustained double-digit economic growth in the coming years.

Legally, the project, located in the former Vinh Thanh district of Binh Dinh province (now Vinh Thanh commune, Gia Lai province after the July 2025 merger), has been approved by the Prime Minister under the revised Power Development Plan for 2021-2030, with a vision to 2050 under Decision No. 768 dated April 15, 2025, and its implementation plan was passed by the Ministry of Industry and Trade under Decision No. 1509 dated May 30, 2025.

The Gia Lai People’s Committee has also incorporated the project into the revised provincial master plan for 2021-2030, with a vision to 2050 under Decision No. 2832 dated November 28, 2025. The initial timeline projected operation during 2031-2032, but local authorities are working to accelerate progress and bring the plant online by 2030.

Vinh Thanh Pumped Storage JSC was established on November 4, 2024, with headquarters on Hoang Van Thu street, Quy Nhon Nam ward, Gia Lai province (formerly Quy Nhon town, Binh Dinh province). Its main business activity is power generation.

The company has a charter capital of VND50 billion ($1.9 million). Its founding shareholders include Tong Phan Long (VND5 billion, 10%), Bui Tien Trung (VND20 billion, 40%), and Le Duc Thoa (VND25 billion, 50%).

The legal representative is Le Duc Thoa (from Thanh Hoa province), who serves as director. He is also the legal representative of La Vuong Wind Power JSC (in Gia Lai) and Gia Nghia Green Renewable Energy Investment and Trading JSC (in Thanh Hoa).


Work starts on $2bn container terminal in Da Nang

Work starts on $2bn container terminal in Da Nang

Da Nang City, central Vietnam on Saturday broke ground on the Lien Chieu container terminal project, which carries a price tag of more than VND45 trillion (US$2 billion), marking a significant step in the city’s long-term economic and logistics strategy.

The project, invested by a consortium of Hateco Group, Hateco Seaport Company and APM Terminals B.V. of the Netherlands, will be executed over a 10-year period from 2026 to 2036, divided into three phases.

Designed to meet international standards, the Lien Chieu container terminal will feature eight berths spanning a total length of 2,750 meters.

The terminal is capable of accommodating vessels of up to 18,000 TEU and will have a projected annual capacity of 5.7 million TEU, equivalent to roughly 74 million metric tons of cargo.

Within three years of its initial operational phase, throughput is expected to reach some four million TEU annually.

Strategically located along international maritime routes, the mammoth terminal sits at the terminus of the East-West Economic Corridor, a critical trade axis linking Vietnam with Southeast Asia and the Mekong subregion.

Beyond its function as a seaport, Lien Chieu container terminal is envisioned as a comprehensive logistics ecosystem, including integrated barge terminals, warehousing, customs inspection facilities, and container handling services, all connected directly to the national railway network to facilitate multimodal transport.

Tran Van Ky, a representative from the consortium, said that the terminal will adopt a ‘green and smart port’ model, incorporating advanced technologies such as the Internet of Things (IoT) and artificial intelligence (AI) to optimize operations.

Automation systems, clean energy usage, and ecofriendly equipment are expected to reduce emissions and align with both domestic and international environmental standards, positioning the terminal within global green supply chains.

Chairman of the municipal administration Nguyen Manh Hung described the project as a strategic collaboration between public investment and private sector commitment, in line with national policies promoting private economic development.

He emphasized that the terminal would serve as a catalyst for the city’s growth, helping to complete a modern logistics network while reducing transportation costs for businesses.

Also, the project is expected to support sustainable urban expansion, separating cargo traffic from tourism flows and reinforcing Da Nang’s role as an international gateway.

Speaking at the groundbreaking ceremony, Deputy Prime Minister Pham Gia Tuc highlighted the project as a milestone in implementing Vietnam’s strategy for sustainable marine economic development.

He noted that the terminal would stimulate logistics services, industrial growth, and port-based urbanization, while also strengthening national defense and enhancing the country’s global standing.

See all blog